Belgrade – Batrovci highway reconstruction, Serbia



Reconstruction works were executed on the Belgrade – Batrovci highway section, total length 104km, as well as on the lateral, service roads Batajnica – Belgrade, total length 7km, and Kuzmin – the border with the Republic of Srpska, total length 17km.

 

The executed works included widening the existing carriageway, old asphalt layer removal, execution of new roadbase and wearing course, safety fence and road signalization placement.

 

New asphalt layer covers the surface of 283,770m2.

 

Employer: Roads Directorate of the Republic of Serbia