Asphalt pavement was placed over 10.6km of the road, covering 4 traffic lanes. The road width was extended for 1m and the reconstruction works on the roadbase were executed. The damaged asphalt pavement was removed from the roadbase and completely new asphalt pavement was executed. New curbstones were placed, along with the new drainage network. Vertical and horizontal signalization was also renewed.
Employer | ||
Road Directorate of Serbia | ||
Main quantities of works |
||
excavation |
17.487
|
m3 |
back-filling – sand |
10.953
|
m3 |
asphalt concrete BNS 22sA |
125.190
|
m2 |
AB11sA, with PmB I SMA 0/11 |
110.696
|
m2 |
curbstone placement |
14.000
|
m |
metal safety fence placement |
13.642
|
m |