M19 road rehabilitation, section Cukarica – Ostruznica, Serbia

 

Asphalt pavement was placed over 10.6km of the road, covering 4 traffic lanes. The road width was extended for 1m and the reconstruction works on the roadbase were executed. The damaged asphalt pavement was removed from the roadbase and completely new asphalt pavement was executed. New curbstones were placed, along with the new drainage network. Vertical and horizontal signalization was also renewed.

 

Employer
Road Directorate of Serbia
Main quantities of works
excavation
17.487
m3
back-filling – sand
10.953
m3
asphalt concrete BNS 22sA
125.190
m2
AB11sA, with PmB I SMA 0/11
110.696
m2
curbstone placement
14.000
m
metal safety fence placement
13.642
m