Upon the request of PE “Belgrade Waterworks and Sewerage”, a regional, reinforced concrete, storm water main drain, with rectangular cross-section was executed for the purpose of draining storm waters along the city highway. The main drain structure has reinforced concrete diaphragms as walls.
Employer
|
Belgrade Land Development Public Agency
|
Phase I
|
total length
|
600
|
m
|
cross-section
|
4.50 x 4,50
|
m2
|
relieving structure
|
2
|
pcs
|
Phase II
|
total length
|
850
|
m
|
cross-section ( 540 m )
|
4.50 x 4.50
|
m2
|
cross-section ( 310 m )
|
4.00 x 4.00
|
m2
|
relieving structure
|
2
|
pcs
|
catching structure with sedimentation chamber
|
1
|
pcs
|
Major quantities
|
support – Larsen piles
|
1,200
|
m
|
excavation
|
120,000
|
m3
|
reinforcement
|
2,100
|
t
|
water resistant concrete
|
27,000
|
m3
|
embankment
|
35,000
|
m3
|
clinker brick
|
7,300
|
m2
|
reinforced concrete diaphragm
|
1,700
|
m
|
|
View Larger Map |