07 Dec 2024 12:51pm
  • mityana-mubende.jpg

Mityana – Mubende road, Uganda

 

The Mityana – Mubende section of Mityana – Fort Portal road alignment represents a part of the East Africa communication system, connecting Kenya, Uganda and Congo.

 

Employer
Uganda, MOWTC
Road section
length
86,0
km
carriageway width
2 x 3,5
m
shoulders
2 x 1,5
m
Main quantities of works
earth works
5.400.000
m3
sub-base d = 15cm
450.000
m3
lime stabilization d = 15cm
216.000
m3
double surface dressing
1.570.000
m2
drainage culverts
Ø 600 mm - Ø 1200 mm

9.800

m
flexible safety fence
40.000
m

View larger map