Pump Station in Novi Sad, Serbia

 

 

Reconstruction of the existing pump station “Sever 4” and the construction of a new pump station “Ratno ostrvo” were executed to meet the requirements of PE “Waterworks and Sewerage”. These two pump stations are connected by GRP pipes, while the outflow into the Danube includes ductile pipes.

 

Employer

PE Waterworks and Sewerage, Novi Sad

Pump stations

Sever 4 - pump capacity

3 x 250

l/s

power

3 x 50

KW

Ratno ostrvo – pump capacity

3 x 250

l/s

power

3 x 35

KW

Pipelines

total length

2,300

m

excavation

18.000

m3

embankment

50.00