The project included rehabilitation and reconstruction of the existing road alignment, total length 50 km. The works on existing road widening and sub-grade reconstruction were executed. The base was executed using crushed aggregate, thickness 17.5cm. Asphalt was used for the execution of the wearing course, thickness 10cm. Drainage works were also executed along the road alignment including several metal pipe culverts, concrete canals and gutters. Road signalization was also placed.
Employer | ||
Peru, Ministry of Transport - MTC / Special Infrastructural and Transportation Projects - PERT / Transportation Rehabilitation Program - PRT | ||
Main quantities of works | ||
Excavation |
112.000
|
m3
|
Sub-grade |
43.000
|
m3
|
Base |
77.000
|
m3
|
Asphalt |
600.000
|
m2 / 31.843m3
|
Concrete |
7.532
|
t
|