The Project included the construction of rainwater service network in the centre of Buenos Aires. It consists of 4 tunnels whose cross-section is Ф 4.4 meters and one tunnel whose cross-section is 2.8 m. All tunnels were double-lined with concrete. The works were executed by tunnel boring machines (TBM) after relocating the existing installations. Main concrete drains of large rectangular cross-section, as well as secondary network were executed simultaneously, in an open cut.

 

Employer

Ministry of Development, Argentina

Four tunnels

cross-section

Ø 4.4

m

total length

5,978

m

concrete lining, thickness

20.0 + 12.0

cm

Tunnel

cross-section

Ø 2.8

m

total length

1,852

m

concrete lining, thickness

12.5 + 10.0

cm

Rectangular main drain

length

1,535

m

cross-section

7.0 x 3.35

m x m

Secondary network

length

5,463

m

diameters

Ø 500 - Ø 1000

mm